Both for spec tests and test template

this way:

  • Grading can be categorized with different weights for the same assignment
  • On failure of one test, the other test groups can still run
  • Time out per test group.
Submitted by Elmer van Chastelet on 23 September 2014 at 13:31

Log in to post comments